Posted inOpinion

Arunachal | Subansiri Lower H E Project: Downstream River Bank Protection Solution– Part-3: Execution

Subansiri River Bank Protection Works Execution: For execution in dry conditions during the lean season a) Provision of Spurs at 250-300m c/c either with boulder-filled Gabion Box of size 3m x 1m x 1m with sand-filled Geo Bag of size 1m x 0.7m placed in wire crates. Length of spurs kept as 27-30m into river […]